Off site works

In early August, residents will see the start of the construction of the temporary haulage route across Town Moor.


This is a temporary route that will enable the lorries carrying waste material from the main site entrance on Blackamoor Lane, to reach the A4 without using the wider highway network.


The route will start at the corner of Blackamoor Lane (near the site of the small car park) and will cross Town Moor to join in with the road by the Fire Station.

 
Newsletter
Name:
Email: